Gigabit Ethernet installation

Phase One (September 2000): Replace the existing Synoptics/Bay Networks

Inc. Fiber Distributed Data Interface ring, which has been in place since

1993, with a Layer 3 backbone from Cisco Systems Inc.

Phase Two (2001): Begin upgrading the 10 megabits/sec shared Ethernet

hubs in many buildings to Layer 2 switches and begin installing fiber-optic

lines to support a Gigabit Ethernet network. Layer 2 switches offer about

32 gigabits/sec aggregate switching capacity. Perform backhaul of satellite

links through Raytheon Co.'s corporate headquarters to optimize the satellite

bandwidth of the voice-over-IP network.

Phase Three (January 2002): Complete the upgrade of hubs and network.

Featured

  • Workforce
    online collaboration (elenabsl/Shutterstock.com)

    Federal employee job satisfaction climbed during pandemic

    The survey documents the rapid change to teleworking postures in government under the COVID-19 pandemic.

  • Workforce
    By Mark Van Scyoc Royalty-free stock photo ID: 285175268

    OPM nominee plans focus on telework, IT, retirement

    Kiran Ahuja, a veteran of the Office of Personnel Management, told lawmakers that she thinks that the lack of consistent leadership in the top position at OPM has taken a toll on the ability of the agency to complete longer term IT modernization projects.

Stay Connected