Space

After communications hiatus, NASA rover found in standby mode

tracks made by mars rover

NASA's Mars rover Opportunity photographed its own tracks as it climbed out of Victoria Crater in this image from 2008. (NASA/JPL-Caltech photo)

NASA’s Opportunity, which has been traversing the Martian surface dutifully since landing in January 2004, has come out of an expected three-week radio silence in self-imposed standby mode.

Opportunity’s mission controllers first figured something with the rover was awry on April 27, when it came back in contact after a planetary alignment called a solar conjunction in which Mars and Earth were on opposite sides of the sun.

Engineers elected to suspend communications rather than risk the sun corrupting commands to Opportunity, another rover called Curiosity or the Mars Reconnaissance Orbiter.

Mission controllers learned Opportunity put itself into standby on April 22 after detecting issues during a routine camera check, according to a statement from NASA.

“Our current suspicion is that Opportunity rebooted its flight software, possibly while the cameras on the mast were imaging the sun," said Mars Exploration Rover Project Manager John Callas of NASA's Jet Propulsion Laboratory in Pasadena, Calif.

"We found the rover in a standby state called automode, in which it maintains power balance and communication schedules, but waits for instructions from the ground,” Callas said. “We crafted our solar conjunction plan to be resilient to this kind of rover reset, if it were to occur."

JPL officials said they were hopeful of positive news on May 1 regarding Opportunity, but could not immediately confirm whether the rover was back online.

Opportunity landed on Mars nine years ago with its sister rover, Spirit, to look for signs of water activity on the dry planet. Spirit’s systems failed in 2010, but Opportunity has continued sending back useful information, including plenty of evidence of past water flow.

Curiosity, which touched down last August, received its first programming instructions from ground officials on May 1 after the communications moratorium. Unlike its older relative, Curiosity, which has had its own software hiccups, experienced no issues during the blackout, and officials will now begin to focus on how to guide it through Yellowknife Bay to its eventual destination, a three-mile-high structure called Mount Sharp.

Curiosity already succeeded in its main goal of detecting the necessary ingredients for life, having drilled a rock sample containing hydrogen, carbon, oxygen, nitrogen, sulfur, phosphorus and water. It has, however, experienced its fair share of hiccups as well, including a glitch that suspended examination of rock samples on March 16.

About the Author

Frank Konkel is a former staff writer for FCW.

The Fed 100

Save the date for 28th annual Federal 100 Awards Gala.

Featured

  • computer network

    How Einstein changes the way government does business

    The Department of Commerce is revising its confidentiality agreement for statistical data survey respondents to reflect the fact that the Department of Homeland Security could see some of that data if it is captured by the Einstein system.

  • Defense Secretary Jim Mattis. Army photo by Monica King. Jan. 26, 2017.

    Mattis mulls consolidation in IT, cyber

    In a Feb. 17 memo, Defense Secretary Jim Mattis told senior leadership to establish teams to look for duplication across the armed services in business operations, including in IT and cybersecurity.

  • Image from Shutterstock.com

    DHS vague on rules for election aid, say states

    State election officials had more questions than answers after a Department of Homeland Security presentation on the designation of election systems as critical U.S. infrastructure.

  • Org Chart Stock Art - Shutterstock

    How the hiring freeze targets millennials

    The government desperately needs younger talent to replace an aging workforce, and experts say that a freeze on hiring doesn't help.

  • Shutterstock image: healthcare digital interface.

    VA moves ahead with homegrown scheduling IT

    The Department of Veterans Affairs will test an internally developed scheduling module at primary care sites nationwide to see if it's ready to service the entire agency.

  • Shutterstock images (honglouwawa & 0beron): Bitcoin image overlay replaced with a dollar sign on a hardware circuit.

    MGT Act poised for a comeback

    After missing in the last Congress, drafters of a bill to encourage cloud adoption are looking for a new plan.

Reader comments

Please post your comments here. Comments are moderated, so they may not appear immediately after submitting. We will not post comments that we consider abusive or off-topic.

Please type the letters/numbers you see above

More from 1105 Public Sector Media Group